Cloud Migration · Low-Downtime Cutover

Cloud Migration Services from Assessment to Cutover

MYC moves servers, applications and databases to the cloud, or between clouds, with a plan that is rehearsed before it runs. Every migration has measured cutover steps and a rollback path, and data is validated before traffic moves.

What goes wrong in cloud migrations, and how we avoid it

Common failure modes

  • A long write freeze because the data copy is done offline.
  • A big-bang cutover with no tested way back.
  • Lift-and-shift of old problems: same sizing, same single points of failure.
  • Data mismatches found after go-live, because nobody compared source and target.
  • Sync scripts that change data types, for example JSON converting database decimals.

How MYC runs a migration

  • Full load plus change data capture so the source stays online.
  • Rehearsal on real data and a rollback plan before cutover night.
  • A target architecture designed for the cloud, not copied from the old one.
  • A validation gate: counts, checksums and metadata must match before traffic moves.
  • Formats preserved end to end, such as BSON for MongoDB.

Cloud migration services we provide

Assessment & plan

Inventory of applications, data and dependencies, with a migration approach per workload and a realistic timeline.

Target architecture

Network, security, compute and data design for the destination, built as code.

Wave planning

Workloads grouped into waves by dependency and risk, each with its own cutover plan.

Rehearsal & validation

Dry runs on real data that measure duration and verify results before production.

Cutover & rollback

Short, scripted cutover windows with a tested path back.

Database migration

MongoDB, PostgreSQL and MySQL moves, including MongoDB version upgrades in one hop.

MongoDB migration

Containerization

Moving VM-based applications onto Kubernetes when it makes sense.

Kubernetes

Post-migration tuning

Performance, capacity and cost tuning in the weeks after cutover.

Platforms and tools we migrate with

Huawei Cloud
Huawei Cloud CCE
Kubernetes
Terraform
Kafka / Redpanda
MongoDB
Percona Server for MongoDB
Huawei DDS
PostgreSQL
MySQL
GitLab CI/CD
NGINX

Our cloud migration process

  1. 01

    Assess

    Inventory workloads, data sizes, write rates and dependencies, and flag what changes on the target.

  2. 02

    Design

    Target architecture and the migration approach for each workload.

  3. 03

    Plan waves

    Group workloads by dependency and risk, with owners and success criteria.

  4. 04

    Rehearse

    Dry run on real data to measure timing and validate results.

  5. 05

    Cut over

    Freeze, drain, validate and switch traffic in a short window, with rollback ready.

  6. 06

    Stabilize

    Monitor, tune and hand over, with the old environment kept until sign-off.

How we keep downtime short

Change data capture

  • Capture changes before the initial copy starts
  • Apply them continuously until cutover
  • Used in our MongoDB migrations

Staged sync & dual run

  • Keep source and target in sync for days or weeks
  • Test the target with real traffic patterns
  • Decide cutover on evidence

Controlled traffic shift

  • DNS and load balancer changes prepared in advance
  • Canary traffic where the application allows
  • Rollback rehearsed, not improvised

Cloud migration questions, answered

How much downtime does a cloud migration need?

It depends on the workload. With change data capture and staged sync, the remaining downtime is the cutover window itself, which we measure during rehearsal before agreeing it with you.

How long does a migration take?

The assessment gives a realistic timeline per wave. Rehearsals measure the actual duration of data copies and cutovers before production dates are fixed.

Which platforms can you migrate from and to?

On-premise and VMs, other clouds and Huawei Cloud, VMs to Kubernetes, and databases including MongoDB, PostgreSQL and MySQL.

How do you verify the data?

A validation gate compares counts, checksums and metadata between source and target. Cutover only goes ahead when it passes.

What if something goes wrong during cutover?

Each cutover has a rehearsed rollback path, and the source environment is kept until you sign off.

Request a cloud migration assessment

Tell us what you want to move, where it runs today and your downtime tolerance.